Shapoorji Pallonji Group is an engineering and construction powerhouse with a long-standing legacy in India. It is responsible for some of the most iconic landmarks in the Mumbai skyline along with other cities as well.
Here are some of the latest projects completed by the engineering arm of Shapoorji Pallonji Group.
Shiva Statue, Rajasthan (2020)
Called the Statue of Belief, this 351-feet tall statue has a structural steel framework and a shell of ultrahigh performance concrete moulded to its profile. The concrete shell has been designed and casted with every detail, expression, and feature of Shiva.
Kartarpur Corridor Passenger Terminal Building, Punjab (2020)
This state-of-the-art Passenger Terminal Building (PTB) has been constructed for the Landports Authority of India. It is a gateway to the Kartarpur Corridor and serves the Indian Sikh pilgrims as it connects the Dera Baba Nanak shrine in Gurdaspur to Darbar Sahib in Kartarpur, Pakistan.
Syngene's Chemical Synthesis Manufacturing Facility, Karnataka (2020)
This manufacturing facility, constructed in Mangalore, comprises a pharma block, API warehouse, QA/QC building, utility block, and sampling shed along with a canteen and admin building. It also includes a water treatment plant, electrical substation, solvent storage, hydrogen shed, gas cylinder storage shed, and more.
This 269-key hotel is located in the prime area of Dubai's Business Bay. The construction includes basements, a swimming pool, architectural finishing works, external development, MEP, bathroom pods, interior fit-out, signage, landscaping, and more.
Abraj Quartier Residential Towers, Qatar (2020)
Located in The Pearl, Doha, this project comprises 4 towers of 331 furnished apartments each, 25 2-level standard villas, and 5 3-level plus basement VIP Villas along with internal roadways, landscape, and utilities.
FORSAN Central Mall, Abu Dhabi (2020)
Located in Khalifa City, Abu Dhabi, this shopping mall is spread across more than 1.10 million sq.ft. It features a façade with a series of vertical green and brown elements creating a bamboo forest effect. It consists of retail stores, F&B outlets, an entertainment area, a nine-screen cinema, and a Lulu Hypermarket.
GE Diesel Locomotive Factory, Bihar (2019)
This factory has been designed and constructed for GE Diesel Locomotive Pvt. Ltd. It comprises a machine shop, fabrication shop, bogie and wheel assembly shop, metallurgical/chemical laboratory, calibration laboratory, assembly shop, and a paint shop along with warehousing facilities, administrative office, and staff facilities.
MBR Dubai Hills Estate Business Park, Dubai (2019)
This business park in Mohammed Bin Rashid City, Al Khail Road consists of four office buildings, hard and soft landscaping, and a multi-storey car park with basement and retail areas as well as associated works and external services.
One Indiabulls BLU Residential Complex, Maharashtra (2018)
This complex is located in Worli, Mumbai and comprises 3 premium residential towers with 305 dwelling units. This construction project included civil and structural works, underground and overhead water tanks, UG tank, pump room, STP collection tank, and more with external development works such as concrete roads and drains.
Suzuki Motors Automobile Manufacturing (Plant A & B), Gujarat (2018)
This automobile manufacturing facility is located in Hansalpur near Ahmedabad. The construction project also included ancillary buildings and the utility services of UG Water Tank, WTP, Boiler and Compressor House, ETP, STP, Substation Rooms, Bituminous Roads, Storm Water Drains, Sewer Lines, and more.
Ford Vehicle Assembly & Engine Plant, Gujarat (2014)
Located at Sanand, this project included the construction of a stamping shop, a paint shop, a body shop. It also involved site development work, civil and structural steel work, finishing work, roads, storm water drains, and external development work.