Showing posts with label Shapoorji Pallonji projects. Show all posts
Showing posts with label Shapoorji Pallonji projects. Show all posts

Friday, July 29, 2022

10 Classic Shapoorji Pallonji Construction Projects in Mumbai

 Ever wondered how Shapoorji Pallonji became the leading construction company in the world?

Reserve Bank of India (Old and new building)
Bank of India
Taj Mahal Palace Hotel — Tower Wing
Oberoi Towers
Breach Candy Hospital
Brabourne Stadium
FIFC
Peninsula Business Park
Rehab Towers, Sarova Township — 2018
Reliance Corporate IT Park — 2014

Thursday, September 23, 2021

Shapoorji Pallonji Construction Projects in 2021

 Shapoorji Pallonji Construction Projects in 2021


Shapoorji Pallonji And Company Pvt. Ltd. has a specialized unit in the engineering and construction segment in India which goes by the name of Shapoorji Pallonji Engineering & Construction (SP E&C). This unit provides end-to-end solution solutions in its specified sector and has a lot of firsts marked to its name. 

SP E&C was the first Indian company to execute a project overseas, back in 1975 and is also India’s first ISO 9001-2000 certified construction company. It has made numerous contributions to the growth of the economic sector in India. 

In this article, we take a look at the numerous projects that SP E&C has undertaken in 2021 and how it is continuing to make changes in the overall landscape of the world. 

Shapoorji Pallonji Construction Projects, 2021

Shapoorji Pallonji undertook various projects in 2021, some international and some domestic. Let’s take a look at them below.

  • Admiralty Evercare Hospital, NigeriaSP E&C was responsible for the construction of this 165-bed hospital complex that included a hospital building, car park building and ancillary buildings.
  • Thanaya Residential Building, Abu Dhabi: The construction of this project consisted of 84 dwelling units which included basements, underground and overhead water tanks, swimming pool, pump room, staircases, elevator cores, vehicular ramps and more.
  • Jammu General Bus Stand, Jammu & KashmirSP E&C was involved in the design, engineering, procurement and construction of this project which involved a general bus stand and a multi-level car parking plus commercial complex. In addition to that, the project included a chiller plant room, substation work, DG and HSD yards, various water facilities, vehicular ramps, elevator cores, and associated external development works, among others.
  • Aquatic Gallery, Ahmedabad: Home to almost 190+ species of fishes from different aquatic and marine ecosystems around the world, this 5th-generation, world-class public aquarium takes its visitors through a sensory experience filled with information, interaction and education.
  • Green Peak Adventure Resort, Oman: This resort involved the construction of 52 independent 4-star standard villas (208 keys), along with buildings housing 45 keys hotel suites. It also included the construction of the main facility building and the development of the external adventure area.
  • Mediclinic Hospital Expansion, Abu Dhabi: This project is an extension to the Al Noor Hospital. It included the construction of a campus that consisted of a 130-bed capacity block, VIP areas, specialty treatment rooms, external works and a link bridge of the old hospital to a central utility plant.

With a few months remaining in the year, SP E&C might have more projects under their belt.