Wednesday, November 23, 2022

What are the Types of Civil Engineering?

 

  • Infrastructure Engineering
  • Structural Engineering
  • Environmental Engineering
  • Geotechnical Engineering
  • Transportation Engineering

What are MEP and EPC?

 

  • Mechanical: This deals with the building’s air conditioning, heating and ventilation. Mechanical aspects are carefully designed and installed to set optimum temperatures and for comfortable living. MEP engineers build unique designs for each of the different types of buildings to address specific ventilation, heating and air conditioning requirements while trying to make it as cost-efficient as possible.
  • Electrical: MEP engineers use special MEP software to plan wiring and conduit layout structures to minimise total circuit length and avoid conflict with the plumbing and mechanical installations. The main purpose is ensuring the electrical system is simple, cost-effective, and functions efficiently.
  • Plumbing: This refers to planning a plumbing structure for optimum, smooth water flow, wastewater disposal, acid waste systems, water supply, etc. Each building has a different plumbing layout requirement, and MEP engineers work to address them respectively.
  • Engineering: Consists of initiation, planning, estimation and design development.
  • Procurement: Includes purchasing, expediting, receiving and invoicing.
  • Construction: Involves the construction schedule, on-site material handling, building activities, on-site client communication and finally, the closing of the project.

The function of voltage regulator in solar biomass hybrid power plant

 


Friday, October 28, 2022

What Type of Approval is Required to Set up a Solar Power Plant in India?

 What Type of Approval is Required to Set up a Solar Power Plant in India?

  • Submitting the application form to DISCOM along with the application fee.
  • After reviewing the application, the authorities decided to give approval for the applied capacity of the solar plant.
  • In the next step, the rooftop owner registers for installing solar power plants with the required documents and makes the payment of registration charges. Here people also need to apply for the net metering facility for their solar plant.
  • Following this, the customer signs the connection agreement with DISCOM for the initiation of the installation process.
  • Once the installation of the solar plant completes, DISCOM officials evaluate the standard compliance and sanction the project.
  • After the feasibility analysis of the site from the local substation to ensure the ability of the grid to handle the power level of the solar power plant, people need to get a permission letter for power evacuation from the DISCOM.
  • Requirement of a land conversion certificate when using agricultural land. This certificate is necessary to prove that the land will no longer be used for agricultural purposes.
  • License for contract work issued by the labour department.
  • Approval for sewage treatment facilities.
  • Permit of the environment clearance by the pollution control board.
  • Fire department’s certificate of fire safety.
  • Clearance permit from the forest department.
  • Chief Electrical Inspector’s approval for project commissioning.
  • MNRE approval for the solar power project’s tax exemptions.

Thursday, October 27, 2022

Shapoorji Pallonji EPC Projects

 Shapoorji Pallonji EPC Projects

Overview of Shapoorji Pallonji EPC Services

EPC Projects of Shapoorji Pallonji

1. Bauxite Handling Capacity:

Bauxite Handling Capacity

2. 70MW Peat-fired Thermal Power Plant:

70MW Peat-fired Thermal Power Plant

3. Ore Bedding and Blending Plant at SAIL:

Ore Bedding and Blending Plant at SAIL

4. World-class Turnkey Solutions:

5. Inline Hot Strip and Thin Slab Caster Mill at NMDC:

Inline Hot Strip and Thin Slab Caster Mill at NMDC

Some Other EPC Projects of Shapoorji Pallonji

  • In 2019, Shapoorji Pallonji EPC executed 1 Million Tons per annum, Combi Caster, at RINL, VIZAG.
  • In 2022, a Lime & Dolomite Calcination Plant of RML-III was executed in Bhilai.
  • In 2017, the Musandam Mine project ended in the Musandam peninsula of Oman.

In a Nutshell


Explain the Challenges Faced by Developers of a Solar Power Plant